Production dashboard
Example. Every Monday morning the production head opens Dashboard, chooses Production and sets the date range to this quarter. Delivery Commitment shows two work orders marked DELAYED against the customer's date, and Bottleneck — Process Load shows that most open job cards are waiting at Welding. Further down, Dispatch Planning lists what is due to go out this week, and the production head exports it for the dispatch meeting. To see which department is holding up the late orders, they click Open Full View on Production Planning Summary and filter by Department.
What it does and when to use it#
The Production dashboard gives a production head, planner or dispatch team one page that shows how work orders are progressing: how many are in each status, which are likely to miss their dates, where job cards are piling up, what came out of production each day and what has to be dispatched soon. Use it for the daily production meeting, the weekly dispatch review and to find the department behind a delay.
Before you start#
✅ Before you start
0/4 readyWhose records you see. Members whose Production settings under Admin → Team have Can View All Members Production Entries ? set to Yes, and admins (Is Admin on their team member record), see every work order and job card. Everyone else sees only the work orders and job cards assigned to them or created by them (for Work Order Distribution, also work orders where they are assigned to a product or a bill of materials requirement). Production Planning Summary is the exception: it shows the plans of every work order at the Location to everyone who can open the dashboard.
How to open it#
Dashboard → Choose Dashboard → Production. The date range at the top starts on the Analysis Time Period of your account (otherwise the current calendar year) and cannot be cleared. Changing it reloads every card except Dispatch Planning, which has its own date range.
The cards#
| Card | What it counts |
|---|---|
| Work Order Distribution | Work orders dated in the range, by status: Pending, In Progress, Completed, Amended and Cancelled. Click a segment to list them with Date, Work Order No, Customer Name, Product Name, Our Target Date, Customer Target Date, Created By and Assign To; a work order's remarks open in Work Order Remarks |
| Production Health | Open work orders (not Completed, Cancelled or Amended) created in the range that have both a predicted completion date and Our Target Date. ON TRACK when the predicted completion is on or before our target date, otherwise DELAYED. The list shows Our Target Date, Predicted Completion, Status and Health |
| QC Pending | Completed job cards dated in the range that need inspection and have no inspection report yet, grouped by how long they have waited: 0-24h, 1-3 Days and 3+ Days. Waiting time after the first day counts working days only, skipping Sundays and the holidays in the Holiday Master of the selected Location. The list shows Job Card, Item, QC Request Date, Quality Inspector and Pending For |
| Delivery Commitment | Open work orders (not Completed, Cancelled or Amended) created in the range that have both a predicted completion date and a Customer Target Date. SAFE when the predicted completion is on or before the customer's date, otherwise DELAYED |
| Bottleneck — Process Load | Active job cards (not Completed or Cancelled) created in the range, grouped by their current process. The tallest bar is the likely bottleneck. The legend shows the first five processes with their counts; with more, +N more opens All Processes, which lists the other processes with their counts. Click a bar for the job cards with Qty, Current Process, Assigned On, Assigned To, Pending For and Status |
| Daily Production Output | Completed job cards dated in the range, added up by day (the day of the inspection report, or the job card's last update when there is none). Click a point for the job cards behind it, with Actual Qty, Accepted Qty and QC Status (Inspected, QC Pending or Not Required) |
| Dispatch Planning | One row per product line of every work order (not cancelled or amended) whose Our Target Date falls in this card's own date range. See below |
| Production Planning Summary | Every stage of the production plans of work orders dated in the range (cancelled work orders and stages left out), with its delay. See below |
Most cards let you filter their drill-down list by work order, customer, item, process, assignee or status with the filter icon in the column header. Click a work order number to open it.
Which Company and Location. Every card counts only the work orders, job cards and plans of the Company and Location selected in the sidebar.
Dispatch Planning#
Choose the week or dates
📍 Dispatch Planning → date range → ApplyThe card opens on the current week. Pick other dates and click Apply; this does not change the rest of the dashboard.
Filter the list
📍 Column filtersFilter by Work order no., Customer, Customer PO No., Project Title (the product) or Status.
Export it
📍 Dispatch Planning → ExportDownloads the list for the same dates as Excel, with the message Dispatch planning exported successfully!. Without Export on Production → Production Dashboard the button is greyed out.
Columns: Sr. No, Work order no., Work order date, Target Date (our target date), Customer, Customer PO No. (the linked customer order), Project Title, QTY and Status. Use it alongside the weekly task [Action Needed] Review Weekly Planned Dispatches, which the people chosen as dispatch notification receivers get every Monday at 10:00 when the Tasks module is switched on, one task for each of that Company's Locations they have access to (see What MSME Sales Booster does automatically).
Production Planning Summary and Department Delay Summary#
The card lists each stage of each production plan, grouped by work order and product:
| Column | Meaning |
|---|---|
| Work Order, Customer, WO Status, Product | The work order and product the stage belongs to. Click the work order number to open the work order |
| Department, Responsible Person | Who owns the stage |
| Department Target (full view: Target Date), Actual Date | The stage's planned and actual completion |
| Stage Status | The stage's own status |
| Delayed By (full view: Stage Delayed By) | Red, in days. A finished stage that ended late counts actual date minus target date. An unfinished stage past its target counts the days from the target to today. Otherwise the days forecast with Warn Delay. Blank when there is no delay |
| Original Completion, Predicted Completion | The plan's completion dates. The predicted date is updated by the daily delay check at 8:30 in the morning |
| Remarks | The delay reason given with Warn Delay, or the stage remark |
Rows are sorted by work order number, newest first. Filter with the column headers: Customer, Work Order, Product, Department, Responsible Person, WO Status and Stage Status.
Open Full View (the expand button on the card) opens the Department Delay Summary page with the same rows and the same filters, on a full page. Back returns to the dashboard. The full view shows what the dashboard last loaded, so Open Full View is greyed out until the card has finished loading.
How stages become late is explained in Production planning and tracking.
Exports#
Every card except Production Planning Summary has an Export link. For the six summary cards, Export opens Export card Report with its own date range (it starts at your Company's active financial year, or the dashboard dates if there is none) and downloads Excel named after the card and the dates. It is greyed out, with You don't have permission to export, without Export on Production → Production Dashboard. Dispatch Planning exports straight away for its own dates, and its Export is greyed out the same way.
Rules and what it changes#
The dashboard only reads records: nothing you do on it changes a work order, job card or plan. The date range must stay set. Cards that cannot be calculated show empty (for example No Work Orders, No Production Data, No Active Job Cards, No Delivery Data) rather than an error.