Design and bills of materials

DesignUpdated 25 Nov 2026

Design follows the engineering work for a product, from input details to approved drawings, and records engineering changes (ECN). Bills of materials (BOMs) list what a product is made of. They're kept under Production and drive material purchase requests and job cards.

Design page with two cards: Design Requests and ECN
  1. 1Design Requests
  2. 2ECN
Both cards are shown to everyone who can open the Design page; the Export Daily Reports link above them is shown only to roles with Design Requests read.
Open the full-size screenshot of Design: home

Design requests#

You don't create a design request on its own. It starts when a work order product is started with a department of type Design. Each work order product gets one design request at its Location, and the Design Requests list shows only the requests of your current Company and Location. The Department Incharge chosen when starting the product becomes the Design In-Charge and is notified, and the Remark and Files entered there become the request's first Input Details entry. From Start Work Order or Update Work Order, no request is created when the Design module is switched off (Bulk Update on the work order's products still creates one).

StepWhat happens
Input Details → Concept Drawing → Detailed Design → Drawing Verification → Drawing Issues → Drawing SubmissionThe Design In-Charge marks each step done. A finished step can't be reopened
Customer Approval / Electrical AutomationExtra steps can be added when a step is marked done
Drawing verificationA verification round with chosen approvers

Statuses: Pending, In Progress, Completed, Cancelled.

ECN (engineering change notes): Design → ECN → Create ECN. Statuses: Pending, Completed, Cancelled. ECNs are kept per Company and Location, and ECN numbers follow your current Company's ECN numbering.

Design → Export Daily Reports downloads the day's design request activity in your current Company and Location as an Excel file.

Bills of materials#

TopicWhat to know
WhereProduction → Bill Of Materials, or the BOM tab of a work order
BOM typeComes from the item's BOM Strategy in the item master: Standard, Template, Custom or None
When a BOM is lockedThe BOM a work order product uses is frozen once production starts for it (job cards, the first material issue or the finished-goods receipt); it can't then be edited or cancelled. A Standard product gets its own frozen copy, so the shared BOM stays editable
Revised itemsWhen a revised item master is approved, a BOM that uses it shows a revision warning on its view, except a Custom BOM (work orders show none); a BOM whose own product was revised offers Revise BOM

Before you start#

✅ Before you start

0/3 ready

Guides by task#

TaskGuide
Work a design request, approvals and issuesDesign requests
Change one part's drawingEngineering change notes
Build BOMs and multi-level BOMsBills of materials
Import a parts list from CADBOM import from CAD
Split a drawing PDF per partDrawing PDF page split
Revise BOMs, frozen BOMsBOM revisions and frozen BOMs

Rules to know#

  • To work on design requests, a role needs Design → Design Requests: Read to view, Update to work on them and Cancel to cancel. A drawing approver needs only Read to open the request and approve it.
  • To work on ECNs, a role needs Design → ECN: Create to raise, Read to view, Update to edit and complete, Cancel to cancel.
Next step · DesignItem, BOM, design and drawings →