Item to production: item master, BOM, design and drawings

DesignUpdated 25 Nov 2026

Example. You make a conveyor frame to each customer's drawing. The item master says the frame is manufactured with a custom BOM. When an order arrives, the work order product goes to the Design department, which prepares the drawings and gets them approved. The BOM is imported from the drawing's parts list, and production starts from it. A later change to one part goes through an engineering change note (ECN), which adds a new drawing revision.

Who does what#

StepTypical personScreen
1. Item masterEngineering or purchaseSales → Product Master (items you make); Purchase → Item Master (items you buy)
2. Design requestDesign in-chargeDesign → Design Requests
3. Drawing approvalChosen approversDesign request → Request Approval
4. BOMDesign or production engineeringProduction → Bill Of Materials
5. Hand over to productionProduction planningWork order → BOM → Start Processing
6. Drawing changeDesignDesign → ECN

Before you start#

✅ Before you start

0/3 ready

Step by step#

  1. Create the item

    📍 Sales → Product Master → Create Product (products you make); Purchase → Item Master (items you buy)

    Products you make (Finished Goods, Semi Finished Goods) are created in Sales → Product Master; bought items (raw material, bought-out parts, consumables, tools, assets) in Purchase → Item Master. Enter the Category, Name, Item Code and Item Description, and the units of measure (base, purchase and pricing), plus the HSN/SAC code. For a manufactured item (Category Finished Goods or Semi Finished Goods), set Manufactured Part / Requires Processing to Yes, choose the Processing Type and Process Routing (they appear once it is Yes), and set the BOM Strategy (required):

    BOM StrategyUse it when
    Standard (Fixed BOM)Every unit is made the same way; one BOM is reused
    Template (Clone & Modify BOM)Orders start from a template BOM and are adjusted
    Custom (Order-Specific BOM)Each order is engineered to the customer's drawing
  2. Run the design request

    📍 Work order → Products → Start Work Order, choosing a Design department

    Design requests aren't created on their own. Starting a work order product with a Design department creates one, and the work order moves to In Progress. Your role needs Production → Work Orders update. In Start Work Order, choose the Department and Department Incharge, add a Remark and, for a Design department only, files in the Files column. The confirmation warns that the department and responsible person can't be changed back. The remark and files become the request's first Input Details entry, and the Department Incharge (an active user with access to your current Location) becomes the request's Design In-Charge, who gets a notification (You have been assigned as design in-charge for …) unless they started it themselves. From Start Work Order or Update Work Order, the request is created only when the Design module is switched on for your account. Products → Bulk Update with a Design department creates the requests even when the Design module is off, with the same in-charge, remark, files and notification. A work order product never gets a second one. In Design → Design Requests, the in-charge moves the request through its steps (Input Details, Concept Drawing, Detailed Design, Drawing Verification, Drawing Issues, Drawing Submission) and uploads the drawings; see Design requests.

  3. Get the drawings approved

    📍 Design request → Add Approver → Request Approval

    Each approver chooses Approve Design or Raise Issue. Issues are resolved and approval can be requested again with Request Re-Approval. When the drawings are final, Done completes the request.

  4. Build the bill of materials

    📍 Production → Bill Of Materials → Create BOM (page Create New Bill Of Material)

    Choose the Finished Product (required), the Drawing No, Department and Designed By, and use Upload Drawing File and Upload Other Files. Add parts under Requirements (Materials) with Add Item.

    • Add the parts by hand, or use Import From Excel with a parts list exported from your CAD software (BOM import from CAD).
    • A drawing PDF uploaded with Upload Drawing File can give each part its own drawing (Drawing PDF page split). Enter the page in the line's Drawing Page No. column; when you save, that page is copied into the line's files as a PDF named with the line's item code. Lines with no page number, or a number that isn't a page in the PDF, get no drawing page.
    • When you update the BOM, replacing the main drawing re-creates the page for every line with a page number; otherwise only lines whose page number changed are re-created. When the new page exists, the line's previous item-code PDF is removed and replaced, so don't attach your own file with that same name.
    • From a work order with no BOM, Create BOM on its BOM tab opens the same form for that product.
  5. Hand the product to production

    📍 Work order → BOM → Start Processing

    Production starts from the BOM: job cards are created, materials are added to the work order and shortages become a purchase request. Once production starts for a work order product (job cards, the first material issue or the finished-goods receipt), the BOM it uses is frozen and can't be changed after that; a Standard product gets its own frozen copy, so the shared BOM stays editable. See Customer order to invoice.

  6. Change a drawing or the BOM

    📍 Design → ECN → Create ECN, or BOM → Revise BOM
    • Drawing change for one part: create an ECN with the Work Order Number, Product, Part No, Assign To and the Reason For Change. Mark ECN as Completed with Upload New Drawing adds a new revision to that part's drawing history on the BOM. Always upload the new drawing: completing without one leaves the part with no drawing.
    • New BOM version: Revise BOM with a reason. The button appears on an active BOM once its product's item master is Revised. The old BOM becomes Revised and inactive; the new version is Active. See Engineering change notes and BOM revisions and frozen BOMs.
    • New item revision: approving a revised item doesn't change BOMs or work orders already saved; they keep the old version. A standard BOM that uses the old item shows a revision warning when you view it. When you Revise BOM, the new BOM version takes the latest approved revision of the product; lines keep the items they have, so change revised lines yourself in the revise window.

Statuses#

RecordStatuses
Item masterActive, Cancelled; in accounts set up for fixed BOMs also Under Revision, Pending Approval, Revised and Frozen
Design requestPending → In Progress → Completed (or Cancelled)
Bill of materialsActive; Frozen (the BOM a work order product uses, once production starts for it); Revised when a newer version replaces it; Cancelled

There's no separate drawing library: drawings live on design requests, the BOM, its parts, the work order and job cards.

Stock and accounts#

Items, BOMs, design requests and engineering changes are records only: saving them doesn't move stock or post to the accounts. Stock moves when material is issued to the work order; see Material for production.

Common mistakes#

Working through a design request and an ECN#

  • Design request: on the request's page, turn on Edit (the design in-charge or the person assigned to the current step). The step's assignee clicks Request Review; the in-charge then chooses Request Rework or Mark as Done. Submit Remark saves new remarks and files on a step. On the last step, the in-charge clicks Done → Confirm & Complete, which completes the request for good and can send the product to the next department. On drawing verification, Mark as Done needs every mandatory approver's approval (with none mandatory, one approval); with no approvers added, the step can be marked done directly.
  • ECN: the assignee turns on Edit, uploads the new drawing (PDF) under Upload New Drawing, fills in the change effects and Affected Departments, and clicks Done → Mark ECN as Completed → Submit. After submitting, the screen no longer lets you edit or cancel the ECN.

Daily design report#

Design → Export Daily Reports downloads the day's design activity of the Location you are working in. See Design requests.

Rules to know#

  • A design request can be completed (Done) only while it is In Progress.
  • Cancelling a design request needs a reason.
  • An approver can approve only their own entry, and only in the latest approval round.
  • A drawing approval round is approved once every mandatory approver has approved; if no approver is mandatory, it is approved as soon as one approver approves.
  • The Part No on an ECN must be a part in the BOM you selected.
  • When an ECN is completed, the new drawing revision number is the name of the file you upload (including .pdf).
  • Editing an ECN changes only its description and reason for change.
  • In a Company, a product can have only one active BOM made without a work order: Selected Product BOM already exists: … blocks a second one. Accounts set up by MSME Sales Booster for fixed BOMs also refuse it when saving.
  • A BOM needs at least one line under Requirements (Materials).
  • Each BOM line shows a stock status. Items not in inventory show New (To Be Procured). For items in inventory, a new BOM line takes the item's own stock status from inventory; when it has none, the line shows In Stock if available stock covers the planned quantity, Partially In Stock if some is available, and Out Of Stock otherwise.
  • Each BOM line's drawing page number must be a page in the uploaded PDF; repeated numbers count once and invalid numbers are ignored without a warning, so check each line's drawing.
  • BOM numbers are BOM-work order number-NNNN for BOMs made from a work order, otherwise BOM-NNNN.
  • The Excel import needs exactly the six column headings of the BOM template; capitals and extra spaces don't matter.
  • Columns in the import file are read by position, so keep them in the template's order.
  • An import file with no rows is refused.
  • Upload stays greyed out until you choose a file, and always for a role without Production → Bill Of Material create.
  • Importing replaces any BOM lines that have the same item code as a row in the file.
  • A BOM can't be cancelled once it is cancelled, revised or frozen (production has started on its work order).
  • Design request numbers (DR…) come from one series shared by all your Companies and Locations.
  • Design requests and BOMs belong to the Location they were made in: their lists and pages show only those of the Company and Location selected in the sidebar.
Next step · Production planningCustomer order to invoice →