Example. Work order 0042 has 4 custom conveyors. Each conveyor's BOM has 30 lines. On the BOM tab the planner clicks Start Processing. In the wizard she ticks the 12 fabricated parts as In-House, marks the powder coating parts Outsource, leaves the bought bolts and steel unticked so they become raw materials, raises a material purchase request for the 400 bolts that aren't in stock, sends the coating parts out on a job-work request, picks a process routing for each fabricated part and clicks Start Processing on the Review step. Twelve job cards appear on the Job Cards tab.

What it does. Starting processing turns a work order product's BOM into shop-floor work. In one step it creates the job cards, adds the raw materials to the work order and reserves them from free stock (the first time), raises a purchase request for any shortage, raises Outsourcing purchase requests for job work, and, when job cards are created, freezes the BOM the work order uses. A BOM made for this work order is frozen itself. A Standard product that still uses the shared master BOM gets its own frozen copy of it for this work order, and the master BOM stays editable for new work orders.

Work orders, job cards, reservations and purchase requests belong to the work order's Company and Location. You start processing while working in that Company and Location; users working in another Company or Location don't see these work orders.

Before you start#

✅ Before you start

0/5 ready

The BOM tab#

Open the work order, choose the BOM tab and Select Product.

Product's BOM StrategyWhat the tab showsActions
Standard / TemplateThe product's BOM tree (Item (Level), Planned Qty, Required Qty, Total Estimated Process Time, Total Estimated Process Cost, Item Category, Process Type, Process Steps)Create BOM when the product has no BOM; otherwise Start Processing and Update BOM (Template only); each row's Show More → View BOM, and Update BOM for rows with a child BOM
CustomBill of Materials with Item (Level), Qty, Drawing Number, DrawingsCreate BOM when none exists; otherwise Assign Items, Start Processing / Continue Processing and Update BOM; each row's Show More → View Detail, and Update BOM for rows with a child BOM

On a completed work order these buttons are not shown. Create BOM is greyed out on a cancelled or amended work order.

For a Custom product the processing button reads Processing Unavailable (greyed out) on a cancelled or amended work order, Continue Processing when the product has started and some BOM items are still pending, and Processing In Progress (greyed out) when every BOM item is already processed. For a Standard or Template product Start Processing is greyed out, with the reason as a tooltip, when the work order is cancelled (Work order is cancelled) or amended (Work order is amended), or the product has started (Selected product already is in progress). Update BOM is greyed out once processing has started for the product (Custom: Processing started can't update BOM; Template: Process already started for this product); on a Template product also when the BOM is frozen or cancelled or the work order is cancelled or amended (the tooltip names the reason).

For Assign Items see Bills of materials.

Custom products: the Start BOM Process wizard#

  1. Define Product Structure

    📍 Start BOM Process → step 1

    Tick the parts to process and choose each one's Processing Type: In-House, Outsource or Mixed (Combination of in-house and outsource processing.). With several ticked, Set bulk process type and Apply sets them at once. The selected parts will proceed for processing. Unselected items will appear in the next step under Add Raw Materials.

  2. Define Part BOMS

    📍 step 2

    Please add all raw materials required for this product. Under Select Raw Materials pick BOM lines that are raw materials, or Add New Raw Materials (Item Code, Item Description, Planned Qty, UOM). Tag each with the Part No it is for (Bulk assign Part No for several). The table shows Physical Stock, Reserved Stock, Free Available and Shortage.

  3. Create Material PR

    📍 step 3

    Lines that are SHORT or OUT OF STOCK (or IN STOCK) are listed with Required Qty, Physical Stock, Reserved Stock, Free Available, Incoming Qty (From PR) and Shortage Qty. Tick the lines to request, choose the Purchase Incharge and Your Department.

  4. Create Job Work PR

    📍 step 4

    Parts marked Outsource (and not already on the material request) are listed: enter Request Qty, Outsourcing Reason (for example Needs coating), Remark and Upload Files, then the Purchase Incharge, Your Department and Expected Delivery Date. Any processing items marked for outsourcing will be displayed here and auto-added to the purchase request.

  5. Define Process Routing

    📍 step 5

    Assign Process Routing to BOM Items: for each In-House or Mixed part choose the routing (code - name) and Assign To (the job card assignee). The note on this step explains the rule: a Mixed part's routing must include at least one Outsource process, and an In-House part's routing only In-House processes. Each row's routing list only offers routings that fit the part's Processing Type. If you pick a routing for several rows at once and it doesn't fit some of them, Process Routing Assignment Failed lists those parts and their routing is cleared.

  6. Review and start

    📍 step 6 → Start Processing

    Check Process Chain, Raw Materials, Requested Raw Material PRs and Outsourcing PRs. Once processing has started, we will create job cards for all the selected parts automatically. Click Start Processing (Starting Processing...). Cancel asks Are you sure you want to exit?; nothing is saved until you start.

When a product can't be started. On Review, Start Processing stays greyed out (no message) when the work order is cancelled, amended or completed, or the product is completed, cancelled, on another Location or has nothing left to process. If the start is refused after you click it, an error message beginning Cannot start processing: … gives the reason.

For most other refusals the error message is the general Something went wrong. We have been notified and will check this out shortly. Causes to check: a semi-finished part that is outsourced on its own child BOM but marked In-House or Mixed here (mark it Outsource), or a part whose child BOM routing is missing or inactive. On the fixed-BOM screen the same case is named in the error message: … is outsourced on its child BOM and must be raised as a subcontract request, not an in-house job card.

Standard and Template products: the fixed-BOM screen#

  1. Open it

    📍 Work order → BOM → Start Processing

    Select Product lists the products that can still start. No product can be started appears when completed, fully processed and already processing products leave none. A product whose work order has no BOM yet is refused with Cannot start processing: create the BOM for this Work Order first.

  2. Review BOM Items

    📍 Review BOM Items

    Each line with Item (Level), Item Category, Process Type, BOM Qty, Required Qty, Process Steps, Total Estimated Process Time and Total Estimated Process Cost (finished goods show Manufactured Part as the category). Parts without a chain are highlighted (Missing Process). Choose 👷 Assign To (required) for the job cards.

  3. Check material

    📍 Material Resource Planning

    BOM Qty, Required Qty, Physical Stock, Reserved Stock, Free Available and Shortage for each material; see Material requirement below. For shortages, the Material Purchase Requisition section shows Incoming Qty (From PR), Shortage and To Purchase; choose its Purchase Incharge and Department Requested From. Parts marked Outsource appear in the Outsource Purchase Requisition table.

  4. Split into batches (batch-processed products)

    📍 Batch Production Planning

    When the product's Processing Type in Product Master is Batch, click Add Batch for each line until Remaining: 0; each line shows QC Required or No QC from the item master. Otherwise Start Processing stays greyed out with Batch quantities must exactly match the required quantity.

  5. Start

    📍 Start Processing

    Job cards are created for in-house and mixed parts. When no part is in-house or mixed, Single Job Card Will Be Generated for the whole product, which then needs a product process chain (Please add a Process Chain to the product to continue.). While Start Processing is greyed out its tooltip gives the reason, for example Please add missing process chain for In-House / Mixed items, No valid process routing found for the selected product or Batch quantities must exactly match the required quantity.

Material requirement and shortage#

The requirement is shown on the processing screens; it isn't saved as a separate document.

  • Required Qty = each line's BOM quantity × the work order product quantity ÷ the BOM's Output Quantity, level by level for child BOMs (fixed-BOM screen). On the BOM tab, quantities in a unit set to Is Discrete UOM ? Yes in UOM Master are shown rounded up to a whole number.
  • Free Available = physical stock minus reserved stock, at the work order's Location only.
  • Shortage = required quantity (less any material already issued to the work order) minus available stock at this Location (never below zero). An existing purchase request doesn't reduce the shortage shown, but a new purchase request is raised only for the part not already requested.
  • Finished goods already in stock don't reduce the requirement: each work order is made to order.

Material shortage at this location reminds you that issue and finished-goods receipt also need stock at this Location.

Bought Out products: Bulk PR#

For products of type Bought Out, Products → Bulk PR opens Create Purchase Request — Bought Out Parts with Item Code, Description, Ordered Qty, Already Requested and Qty to Request (Max = Ordered − Already Requested). Tick the lines and click Create PR (n selected) to open a purchase request filled with them. Fully requested lines are greyed out (Already Fully Requested). The button appears only when the work order has Bought Out products, and is greyed out with All Bought Out parts have already been requested or, without Purchase Requests create permission, You don't have permission to create PR.

Job work (subcontracting)#

Job-work requests are raised in four places, all as Outsourcing purchase requests that start Open:

  1. the wizard's Create Job Work PR step,
  2. the fixed-BOM screen's Outsource Purchase Requisition,
  3. a job card reaching an Outsource process (see Job cards and production batches),
  4. Create Outsourcing Request (dialog Request Outsourcing Items) in the work order's Bill of Materials table, on older work orders that show it instead of the start-processing button; it needs Create on Purchase Requests.

The BOM lines they cover show Purchase Requested, and the Purchase Incharge gets a task when Tasks is on. From there Purchase follows the normal flow (Purchase request to stock).

Effects#

  • Production: job cards (and production batches for batch items) are created; the work order's BOM is frozen (a Standard product gets its own frozen copy of the master BOM).
  • Inventory: raw materials are reserved from free stock at the work order's Location the first time processing starts for the product (not again on Continue Processing); see Stores, stock views and reservations. Nothing is issued and no stock leaves a store yet.
  • Finance: no accounting entry is made when processing starts.
  • Purchase: purchase requests for shortages and outsourcing.
  • Tasks: job card assignees and the purchase in-charge get tasks when Tasks is on.

Common questions#