Bills of materials: create, multi-level BOMs, view and cancel
Example. A conveyor is made of a frame, a drive unit and rollers. The designer creates the conveyor's BOM with the frame and drive unit as lines. The drive unit is itself manufactured, so from the conveyor BOM she clicks Add Child BOM on that line and creates its own BOM with the motor, gearbox and brackets. Explode BOM now shows both levels, with process time and cost.
A bill of materials (BOM) lists what a product is made of. It drives the material requirement, purchase requests and job cards when a work order starts processing. BOMs are kept under Production → Bill Of Materials.
Before you start#
✅ Before you start
0/4 readyFind a BOM#
Production → Bill Of Materials lists BOMs with Date, BOM No, Work Order, Product, Output Qty, Created By, Status and Actions (Show More → View, Edit). Filter by Status (Active, Revised, Frozen, Cancelled), Department and Created By. The list shows the BOMs of the Company and Location you are working in; BOMs of another Location or another Company never appear, and a BOM opens, changes and is cancelled only at its own Location. The BOM number is shown in red when cancelled, blue when frozen, orange when revised and purple for a template BOM. Edit is greyed out with Cancelled can't be edited, Frozen can't be edited or Revised can't be edited, and for anyone other than the BOM's creator (Only the creator or designated users can update this entry) or without Bill Of Material update permission.
Create a BOM for a product#
Use this for Standard and Template products, whose BOM is reused by every work order.
Open the form
📍 Production → Bill Of Materials → Create BOMThe Enter Material Details card opens.
Fill in the header
📍 Enter Material Details- Finished Product* (search Finished Goods and Semi Finished Goods).
- Output Quantity and Output UOM (Standard and Template products): how much the BOM makes. Batch-processed products start at their ideal batch size.
- Drawing No, Department and Designed By. Designed By must be an active user who has access to your current Location; otherwise the BOM isn't saved and Something went wrong. We have been notified and will check this out shortly is shown.
- Upload Drawing File (one PDF) and Upload Other Files. The Drawing No is filled in from the drawing file's name.
Add the lines
📍 Requirements (Materials)Click Edit BOM, then Add Item (or Add / Remove on a row), or use Import From Excel (this also needs Bill Of Material update). For each line: Item Code, Item Description, Qty (required), UOM, Material, Drawing No, Drawing Page No. and Upload Files. For Standard and Template products (not on a BOM made from a work order), finished and semi-finished lines also have Processing Type (In House, Outsource, Mixed = in-house and outsource) and Process Routing. Drag rows to reorder. Click Save BOM when done.
Create
📍 CreateCreate stays greyed out until there is at least one line and Save BOM has been clicked (it also stays greyed out when the product already has a BOM, or your role can't create BOMs). The BOM is saved Active, its PDF is made in the background, and drawing pages are split per line.
Reusing a drawing. When the Drawing No matches an earlier BOM, you're asked Existing BOM found with this drawing (…), do you want to autocomplete the BOM items? Yes copies its department, designer and lines. If you then change the lines but keep the drawing number, Warning: Please validate the drawing before creating. reminds you that a later BOM reusing this drawing number will take the new lines.
Stock status per line. The status is read from the stock at your current Location. Items not in inventory there show New (To Be Procured). For items in inventory a line takes the item's own stock status, or In Stock, Partially In Stock or Out Of Stock from the available quantity. The status is information only; it doesn't block anything.
Create a BOM for one work order#
Use this for Custom products, and whenever a work order product has no BOM.
Open it from the work order
📍 Work order → BOM → Select Product → Create BOMCreate BOM is offered when the selected product has no BOM, isn't shown once the work order is Completed, and is greyed out on a cancelled or amended work order. The work order must belong to your current Location. The form opens with the product and Work Order Number filled in.
Fill it in and create
📍 Enter Material DetailsAs above. The BOM is linked to that work order product, and its number is BOM-work order number-NNNN.
Build a multi-level BOM (child BOMs)#
Open the parent BOM
📍 Production → Bill Of Materials → ViewIn Details, the Child BOM column shows the child BOM's number (click it to open the child) when one is linked, and otherwise Add Child BOM on lines linked to a Finished Goods or Semi Finished Goods item. The column is hidden on a cancelled BOM.
Create the child
📍 Add Child BOM → Create Child BOMThe dialog says You are creating a Child BOM under this Parent BOM. The Finished Product* (the line's item), Parent BOM* and Parent BOM Part* are filled in and locked. Output Quantity and Output UOM start from the line's Qty and unit, and Department and Designed By are copied from the parent. Add the lines by hand (there is no Import From Excel in this window), then Create. If that item already has its own active BOM, the window shows Selected Product BOM already exists: … and Create stays greyed out: an existing BOM can't be linked as a child.
Open or explode it
📍 Parent BOM → Details or Explode BOMThe line now links to the child BOM. Explode BOM shows every level.
Add Child BOM is greyed out without the Bill Of Material create permission (You don't have permission).
Read the BOM view#
| Tab | What it shows |
|---|---|
| Details | BOM No, Work Order No (work-order BOMs), Product Name, Output Qty, BOM Strategy, Version No (not for Custom), Department, Total Estimated Cost and Total Estimated Time (not for Custom), Drawing No, Created By, Designed By, Status and, when cancelled, Cancel Reason. The lines show Item Details, Qty, ECN (with View History), Drawing No, Files and Child BOM; Standard and Template BOMs add Estimated Process Time (Per Qty), Estimated Process Cost (Per Qty), Item Category and Process Type, and Custom BOMs add Material. Lines of revised items are highlighted; Standard and Template BOMs also show the Item Revised key |
| Explode BOM (Standard and Template) | The full tree, with Item (Level), Item Category, Process Type, Quantity, Stock Status, Total Estimated Process Time and Total Estimated Process Cost. Export to PDF downloads it with the name, address and logo of the BOM's Company; the PDF isn't saved on the BOM |
| Process Chain (Standard and Template) | The process chain of a part, or of the whole product |
| Files | PDF Files (the BOM PDF, the drawing and any other PDFs) and Other Files, with a count |
| Audit Log | Every change, with who and when |
The per-line estimates add up the process time and cost (from Process Master) of every step in the line's process routing. Total Estimated Cost and Total Estimated Time add the product's own chain and every In House or Mixed line, multiplied by its quantity, including the lines of child BOMs.
Assign a process chain#
Choose the part
📍 BOM view → Process Chain → Select PartOnly parts with Process Type In House or Mixed can have a chain (Process Chains can be added only for parts with Process Type set to In House or Mixed.). Pick the part, then click Assign Process Chain (or Manage Process Chain when it already has one). The button is greyed out on a cancelled BOM.
Pick the routing
📍 Assign / Manage Process ChainSelect Process Chain lists each routing as name (code); the chosen one shows Routing Name, Routing Code, Total Cost, Total Duration and its steps. Click Update (greyed out until you choose a routing). Your role needs Bill Of Material update; otherwise You do not have permission to perform this action. is shown.
When the BOM has no In House or Mixed parts, the tab offers Assign Product Process Chain (or Manage Product Process Chain) for the whole product instead. On the fixed-BOM processing screen's review, a part without a chain is highlighted as Missing Process; assign one first.
Assign stock to BOM lines#
Assign Items (BOM view, or the work order's BOM tab) opens Assign Inventory Items, listing each line with Item Code, Planned Qty, Available Qty, Assigned Qty, UOM and Assign Qty. Enter quantities up to what is still needed and available at your current Location (a line with nothing to assign shows Not Available), then Assign. A work-order BOM can only be assigned from the Location of its work order. Lines become Partially Assigned or Fully Assigned; when every line is fully assigned, Assign Items is greyed out with All items fully assigned. The quantity is taken off the item's available stock straight away and can't be undone here. It isn't a material issue: no stock ledger entry or stock value is posted. On the BOM view your role needs Bill Of Material update (and Inventory read to see the quantities); from the work order it needs Work Orders update.
Update a BOM#
Open Show More → Edit from the list (the screen offers it only to the BOM's creator), or Update BOM on the work order's BOM tab. Change the header, lines and files, then Update. The Finished Product and Work Order Number can't change. A new BOM PDF is made. Update is greyed out until you change something, without Bill Of Material update, and for frozen BOMs. In the work order's Update BOM window, Update is also greyed out for anyone other than the BOM's creator. A changed Designed By must have access to your current Location, as when creating. On the work order, Update BOM is greyed out once processing has started for the product (Processing started can't update BOM); for Standard and Template products see Engineer-to-order and make-to-order. Drawing pages are re-split as described in Split a drawing PDF per BOM line.
Cancel a BOM#
On the BOM view click Cancel, enter the Reason For Cancellation* and Proceed. The screen offers Cancel only to the BOM's creator (Only the creator or designated users can cancel this entry), and your role needs the Bill Of Material Cancel permission (You don't have permission to cancel this entry). Cancel is greyed out once the BOM is cancelled, revised (Bill Of Material is revised and cannot be cancelled.) or frozen (Bill Of Material is frozen and cannot be cancelled.). Cancelling doesn't change stock: quantities already given with Assign Items aren't returned.
Effects on other modules#
- Work orders: a work-order BOM is linked to its product; processing uses it for job cards and material.
- Sales: a BOM reusing an earlier Drawing No marks the linked customer order as a repeat order.
- Inventory: creating a BOM doesn't move stock; Assign Items reduces available stock at your Location without a stock ledger entry.
- Production: when production starts for a work order product, its BOM is frozen; a Standard product gets its own frozen copy for that work order. See BOM revisions and frozen BOMs.
- Design: ECNs change a line's drawing and add a revision; see Engineering change notes.
Rules to know#
- A BOM needs at least one line.
- Only one active BOM per product is allowed in your Company when no work order is chosen: Selected Product BOM already exists: … blocks Create. Work-order BOMs aren't counted.
- BOM numbers are BOM-work order number-NNNN for work-order BOMs, otherwise BOM-NNNN.
- A child BOM's parent must belong to the same Company.