Design requests: steps, drawing approval, issues and finalizing
Example. A conveyor product is sent to the Design department, and Priya, the design in-charge, gets design request DR/26-27/0031. She records the customer's inputs, marks Input Details done and asks for Customer Approval after the concept drawing. After approval, she assigns Detailed Design to Rahul. At Drawing Verification, Rahul adds two approvers, one mandatory, and requests approval. The mandatory approver raises an issue about a guard; Rahul fixes it, the issue is resolved, approval is requested again and given. Priya submits the drawings and finalizes the request, sending the product to Fabrication.
A design request follows the engineering work for one work order product, step by step. It starts automatically when the product is sent to a department of type Design; there is no create button.
Before you start#
✅ Before you start
0/4 readyWhich requests you see#
Design requests belong to the Company and Location of their work order. The list and the request pages show only the design requests of your current Company and Location.
How a request starts#
On the work order, Products → Show More → Start Work Order (or Update Work Order, or Bulk Update) with a department of type Design. Your role needs Production → Work Orders update for this. The Department Incharge becomes the request's Design In-Charge and is notified (unless they sent the product themselves); the remark and files become the first Input Details entry. A product gets only one design request per work order: sending it to Design again, even after its request was cancelled, doesn't start a new one. See Item, BOM, design and drawings.
Find a request#
Design → Design Requests lists Date, Design Request No, Work Order No, Company Name, Product, Requested By, Design In-Charge, Ongoing Process, Status and Actions (Show More → View; there is no Edit). Filter by Status (Pending, In Progress, Completed, Cancelled), Ongoing Process, Requested By, Design In-Charge and Date. Cancelled requests are shown in red.
Statuses: Pending (created) → In Progress (first step done) → Completed, or Cancelled.
Work through a step#
The request page shows the steps, the Current Step and who it is assigned to, and the request's details (Requested By, Design In-Charge, Product, Work Order No, Company Name).
Switch to Edit Mode
📍 Design request → Edit ModeOnly the design in-charge and the person assigned to the current step see the switch, and only while the request is neither completed nor cancelled.
Add remarks and files
📍 Step → Add Remark → Submit RemarkEach remark has a Type, Remark, Files and Notify To (team members to notify). Previous and Next: step let you look at other steps without changing them.
Ask for review (assignee)
📍 Request ReviewWhen a step is assigned to another designer, they click Request Review (greyed out once review is requested). The in-charge's Request Rework becomes available after that and sends it back to them.
Mark the step as done (in-charge)
📍 Mark as Done → Confirm CompletionOnce a step is marked as done, you cannot move back to this step. Remarks also become permanent. Choose at most one option for the next step:
- Do you want Customer Approval in the next step? inserts a numbered step (Customer Approval 1, Customer Approval 2, …);
- Do you want to assign the next process to another designer? with Assign To (Designer);
- Do you want to involve Electrical Department in the next step? inserts a numbered Electrical Automation step, with Assign To (Electrical Automation).
These options aren't shown when the next step is already a customer approval. Once assigned, you cannot change the assignee. The person you assign must be an active user with access to a Location of your Company. Click Yes, Confirm.
Get the drawings approved (Drawing Verification)#
Add approvers
📍 Drawing Verification → Approvers → Add ApproverChoose each approver and whether Is Mandatory ? applies. Approvers must be active users with access to a Location of your Company. When the step is assigned to someone, only that person can add approvers (Only the assigned user can add approvers). When it isn't assigned, the design in-charge adds them in Edit Mode, until approval is first requested. The in-charge or the step's assignee can also Upload design files here.
Request approval
📍 Request ApprovalRequest Approval becomes available once you have added a new approver. The screen warns Once approval is requested, approvers cannot be removed or new approvers cannot be added. (for a step that has an assignee, the assignee can in fact still add an approver and request a new round, which replaces the approver list). Under Current Approval Round, the Approvers table shows S.No., Approver Name, Is Mandatory ?, Requested Date, Approved/Rejected Date, Status (hidden while Edit Mode is on) and Action, with the Design Files. From the second round, Approval History → Show History lists earlier rounds, including each Rejection Reason.
Approve or raise an issue (approver)
📍 Approve Design / Raise IssueEach approver sees Approve Design and Raise Issue on their own row until they have reviewed it. An approver needs Design Requests read to open the request; approving needs no other Design permission, but Raise Issue needs Design Requests update. Raise Issue asks for an Issue Description and Submit. Raising an issue rejects the round and adds an open issue.
Request re-approval
📍 Request Re-ApprovalAfter a rejected round (Previous verification round was rejected. — Resolve the issue and request re-approval.), the step's assignee, the requester or the in-charge requests approval again.
When the step can be marked done: with no approvers, at once; with approvers but none mandatory, after at least one approval; with mandatory approvers, when every mandatory approver has approved and none has rejected or is pending.
Resolve drawing issues#
On Drawing Issues, Issues Raised lists each issue with Raised At, Resolved At, Raised By, Issue Description, Status and Remarks. The design in-charge adds a remark and, in Edit Mode, clicks Resolve on each issue. Bulk Issue Resolve (shown while issues are open, to anyone who can open the request, without Edit Mode; resolving needs Design Requests update) lets you tick several, describe the solution for each ticked issue (required) and click Resolve Selected. For each resolved issue, when the Tasks module is on and the issue has its own task, that task is completed automatically. Otherwise the person who raised the issue gets the notification Issue against design request … has been resolved by …. Next stays greyed out on the step before submission while a mandatory approver has raised an issue or is pending, or when approvers exist, none mandatory, and none has approved. It is also greyed out while Edit Mode is on with unsaved changes.
Finalize the request#
On Drawing Submission, the summary lists every approval and issue. The in-charge clicks Done (greyed out while Edit Mode is on with unsaved changes; save or discard them first). Finalize Design Request shows the Product Name and asks for the next Department and its Department Incharge (both required), with an optional Remark. When the product has a production plan, only the plan's departments are offered and the in-charge is filled in from the plan. Confirm & Complete completes the request for good (Once completed, it cannot be changed again.) and then moves the product to that department. These are two separate saves: moving the product needs Production → Work Orders update. If the move fails, the request is still completed; move the product with Update Work Order on the work order.
Cancel a request#
On the request page, the design in-charge clicks Cancel, enters the Reason For Cancellation* and clicks Proceed (your role needs Cancel on Design Requests). Once cancelled, this entry cannot be modified. To make changes, you will need to create a new entry. Cancel is greyed out for completed and cancelled requests. A second cancel is refused with This design request is already cancelled. The cancellation reason is shown on the request, and the request's linked tasks are cancelled.
Daily design report#
Design → Export Daily Reports → Export downloads Daily Report and Planning - DESIGN DEPARTMENT for one day and your current Company and Location: each design request with a step started or completed that day, with Customer, Work Order Number, Received Date in Design, Product Description (the product code), Status, Design Engineer (the design in-charge) and Requested By. The Target Date column is left blank for you to fill in. Use it for the daily design meeting.
- Export Daily Reports is shown only when your role has Design → Design Requests read.
- The Date can't be in the future; the file is Daily Design Report - DD MMM YYYY.xlsx.
- Members with Is Admin on, and people who may see all members' design entries, must also pick at least one name in Member Names; the report then lists only requests whose Design In-Charge is one of them. Others get every matching request.
- An empty report means no design step started or finished that day.
Effects on other modules#
- Production: the work order moves to In Progress when the request is created; finalizing moves the product to the next department and its production plan stage.
- Tasks and notifications: approvers, and the design in-charge when an issue is raised, get a task when the Tasks module is on and a notification otherwise. A designer assigned to a step gets a task when the Tasks module is on. Task due days come from Admin → Application Settings → Design → Design Requests for your current Company; the Task Priority set there applies to approval and issue tasks, while step assignment, review, rework and remarks tasks are Normal priority. How to change these settings: Design settings.
- Design requests don't move stock or post to the accounts.
Rules to know#
- A design request can be completed only while it is In Progress.
- An approver can approve only their own entry, only in the latest round, and not a verification they requested.
- Cancelling needs a reason.
- Design request numbers (DR/financial year/NNNN) come from one series shared by all your Companies and Locations.
- When a chosen assignee or approver isn't an active user with access to a Location of your Company, the save is refused and the screen shows Something went wrong. We have been notified and will check this out shortly.